Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
Evaluation of scheduling techniques for payload activity planning
01.10.1991
Aufsatz (Konferenz)
Keine Angabe
Englisch
Space Station payload scheduling
NTRS | 1990
|Interactive, Repair-Based Planning and Scheduling for Shuttle Payload Operations
British Library Conference Proceedings | 1997
|