The Ocean Topography Experiment (TOPEX/POSEIDON) mission orbit requirements are outlined, as well as its control and maneuver spacing requirements including longitude and time targeting. A ground-track prediction model dealing with geopotential, luni-solar gravity, and atmospheric-drag perturbations is considered. Targeting with all modeled perturbations is discussed, and such ground-track prediction errors as initial semimajor axis, orbit-determination, maneuver-execution, and atmospheric-density modeling errors are assessed. A longitude targeting strategy for two extreme situations is investigated employing all modeled perturbations and prediction errors. It is concluded that atmospheric-drag modeling errors are the prevailing ground-track prediction error source early in the mission during high solar flux, and that low solar-flux levels expected late in the experiment stipulate smaller maneuver magnitudes.
TOPEX/POSEIDON orbit maintenance maneuver design
AAS/AIAA Astrodynamics Conference 1989 ; 1989 ; Stowe, VT, United States
01.01.1990
Aufsatz (Konferenz)
Keine Angabe
Englisch
TOPEX/Poseidon orbit acquisition maneuver design
NTRS | 1992
|TOPEX/Poseidon Orbit Acquisition Maneuver Sequence
British Library Conference Proceedings | 1993
|TOPEX/Poseidon Orbit Acquisition Maneuver Sequence (AAS 93-571)
British Library Conference Proceedings | 1993
|Topex/Poseidon Autonomous Maneuver Esperiment (TAME)
NTRS | 1996
|