A conceptual and programatic development status evaluation is presented for the NASA Space Station Freedom. A first Freedom-element launch by the Space Shuttle is planned for 1995, with completion of the assembly process by 1998. Man-tended capability is expected to be established by one of the early Space Shuttle assembly flights; a permanently manned capability is expected to be in place by 1996. This construction schedule fundamentally depends, however, on the availability of a replacement Space Shuttle Orbiter whose delivery is expected to occur in May 1991. Attention is given to the international-cooperation aspects of the program.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Space Station Freedom - A program update


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    1990-01-01



    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :


    Update of Space Station Freedom design

    Sisson, James M. / Tinius, Richard | NTRS | 1989


    Space Station Freedom Resource Nodes 1992 Update

    Lauger, John B. | SAE Technical Papers | 1992


    Space Station Freedom Safety Program

    Griggs, John G., III | NTRS | 1989


    Space Station Freedom ECLSS Design Configuration: A Post Restructure Update

    Bacskay, Allen S. / DaLee, Robert C. | SAE Technical Papers | 1991


    Overview of Space Station Freedom program environments

    AVANS, SHERMAN / WEEKS, DAVID / BREWER, DANA et al. | AIAA | 1993