Results are presented from EVA space construction studies performed in 1 g, simulated 0 g, and on-orbit. The studies include tests of astronaut participation on the Mobile Work Station concept and the Swing-Arm Beam Erector. Also, results from the Experimental Assembly of Structures in EVA and the Assembly Concept for Construction of Erectable Space Structure programs are summarized. EVA construction applications for the Space Station are discussed and construction scenarios are developed.
EVA space construction - Experience and fundamental issues
Annual AAS International Conference ; 1987 ; Houston, TX, United States
1989-01-01
Aufsatz (Konferenz)
Keine Angabe
Englisch
British Library Online Contents | 1997
|Switching overview - fundamental issues
Tema Archiv | 1984
|Telerobotics design issues for space construction
NTRS | 1988
|Fundamental issues in intelligent transportation systems
SAGE Publications | 1999
|Fundamental Issues in Automotive Veiling Glare
SAE Technical Papers | 1997
|