The Martin Marietta Shuttle-C project organization has been tailored to fit the tasks required for the Phase B study. Lead responsibilities have been assigned for Program Control, Safety, Reliability, and Quality Assurance (SR and QA); Systems Engineering and Integration (SE and I); Design and Analysis; Production and Test; and Operations. Details of the Performance Review and Orientation Program of November 1987 are given.
Definition of a space transportation systems cargo element (Shuttle-C). Orientation
01.11.1987
Report
Keine Angabe
Englisch
Space Shuttle cargo processing.
NTRS | 1980
|Space Shuttle Cargo Integration Assessments
British Library Conference Proceedings | 2002
|Cargo handling systems for the Space Shuttle
AIAA | 1971
|