The reevaluation of the Space Station that has occurred over the past two and a half years is reviewed, and the system development that has been recently initiated is discussed. Upcoming developments with regard to laboratory outfitting, extended duration Orbiter, and logistics operations are summarized. The goals of the first launches are discussed, and the aims of the succeeding manned flights are examined.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Getting ready to go


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    01.09.1988



    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :


    Getting ready for MLS

    USA, Federal Aviation Administration | SLUB | 1985


    Getting ready for 747

    Adams, J.G. | Engineering Index Backfile | 1967


    Getting Ready for Recovery

    Garvey, W. / Anselmo, J.C. | British Library Online Contents | 2009


    Getting ready for lunar science

    Robertson, Donald F. | Online Contents | 2009


    Getting ready for ISS operations

    Palardy, R. / Poirier, A. / Dubeau, A. et al. | British Library Conference Proceedings | 1996