The development of a model for the cost-effective management of space venture risks is discussed. The risk assessment and control program of insurance companies is examined. A simplified system development cycle which consists of a conceptual design phase, a preliminary design phase, a final design phase, a construction phase, and a system operations and maintenance phase is described. The model incorporates insurance safety risk methods and reliability engineering, and testing practices used in the development of large aerospace and defense systems.
Cost effective management of space venture risks
1986-01-01
Aufsatz (Konferenz)
Keine Angabe
Englisch
NTRS | 1964
|Venture capital: The joys of high risks, high returns
Online Contents | 2011
Cost-effective metro procurement - Balancing the risks in København
Online Contents | 2003
Space technology - Cost-effective space travel
Online Contents | 2002
Cost-effective space mission operations
SLUB | 1998
|