To meet NASA Space Transportation System goals the Shuttle Processing Contractors have to reduce Space Transportation System ground processing time and ground processing costs. These objectives must be met without compromising safety of flight or safety during assembly, test, and service operations. Ground processing requirements are analyzed to determine critical serial flow paths and costly labor-intensive tasks. Processing improvements are realized by improvements in processing methodology, by application of computer-aided technology, and by modernization of KSC facilities. Ongoing improvement efforts are outlined and progress-to-date is described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Streamlining shuttle ground operations


    Beteiligte:
    Heimbold, R. L. (Autor:in) / Reichert, W. H. (Autor:in)

    Erscheinungsdatum :

    01.01.1986


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Shuttle ground turnaround operations

    Buckley, R. H. | NTRS | 1974


    Streamlining carriers maintenance operations

    Emerald Group Publishing | 2009


    Analysis of space shuttle ground operations

    Wilson, J.R. / Vaughan, D.K. / Naylor, E. et al. | Tema Archiv | 1982


    Lecture 14: Ground Operations - Launching the Shuttle

    Jeffrey Hoffman / Massachusetts Institute of Technology | OERSI

    Freier Zugriff