The entire engineering model is being concluded in the shuttle configuration. The flight model components are extensively included in the shuttle configuration and will not be changed until after a binding Atlas/Centaur (A/C) booster decision for the A/C configuration. The urgent projects for the altering of the shuttle configuration on the A/C configuration must be carried out before a binding Atlas/Centaur booster decision is completed. All other modification projects are being delayed until the presentation of a binding booster decision.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    DFVLR Roentgen satellite


    Erscheinungsdatum :

    01.06.1987


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch