An advanced flight prototype regenerable CO2 and humidity control system was delivered to NASA-JSC in February 1980. It is pointed out that this system offers substantial weight savings compared with the Shuttle Orbiter expendable lithium hydroxide CO2 removal system for extended duration missions. The present paper provides a brief description of the 4- to 10-man regenerable CO2 and humidity control system. The potential advantages which can be realized for an extended duration Shuttle mission are considered along with the results of extensive testing conducted at JSC. The performance evaluation and endurance tests show that the system is capable of long-term operation (up to 60 days) without maintenance.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Performance and endurance testing of a prototype carbon dioxide and humidity control system for Space Shuttle extended mission capability


    Beteiligte:
    Lin, C. H. (Autor:in) / Cusick, R. J. (Autor:in)

    Erscheinungsdatum :

    01.07.1985


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch