The Detailed Test Objectives (DTOs) originated as a test or measurement made to verify the function of a vehicle system for certification of a vehicle system. The Detailed Supplementary Objectives (DSOs) are a demonstration or test which has a lower priority than a DTO. The criteria for inclusion on space shuttle mission is discussed.
Shuttle Operational Test and Scientific Investigations
01.04.1985
Aufsatz (Konferenz)
Keine Angabe
Englisch
Shuttle operational expectations
NTRS | 1982
|Shuttle Orbiter Flash Evaporator Operational Flight Test Performance
SAE Technical Papers | 1982
|Space Shuttle Operational Logistics Plan
NTIS | 1983
|