Delivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described.
External tank processing from barge to pad
1985-01-01
Aufsatz (Konferenz)
Keine Angabe
Englisch
Tank cleaning barge "Interknit."
Engineering Index Backfile | 1949
Tank cleaning barge "Interknit"
Engineering Index Backfile | 1949
Motor tank barge "Darleydale H. "
Engineering Index Backfile | 1937
Tugs & Barges - Barge barrage - Shipyards bulge with tank barge orders
Online Contents | 2006
More tank barge orders for Trinity Marine
Online Contents | 1995