The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.
NASA deep space network operations planning and preparation
1982-01-01
Aufsatz (Konferenz)
Keine Angabe
Englisch
NASA Deep Space Network Operations Scheduling
NTRS | 1982
|NASA Deep Space Network operations organization
NTRS | 1982
|Design and Operations of NASA Deep Space Network
NTRS | 2021
|AIAA | 1997
|