Meeting the identified needs of Earth science requires approaching EOS as an information system and not simply as one or more satellites with instruments. Six elements of strategy are outlined as follows: implementation of the individual discipline missions as currently planned; use of sustained observational capabilities offered by operational satellites without waiting for the launch of new mission; put first priority on the data system; deploy an Advanced Data Collection and Location System; put a substantial new observing capability in a low Earth orbit in such a way as to provide for sustained measurements; and group instruments to exploit their capabilities for synergism; maximize the scientific utility of the mission; and minimize the costs of implementation where possible.
Implementation Strategy
1983-08-01
Sonstige
Keine Angabe
Englisch
TQM - Strategy for implementation
AIAA | 1989
|Dual database strategy and implementation
Tema Archiv | 1987
|Implementation of CBTC migration strategy
IuD Bahn | 2006
|Dynamic strategy selection - Implementation and results
British Library Conference Proceedings | 2000
|