The interface between tasks and the sequence of information flow are charted. The mission model and the requirements of each mission. These requirements along with the mission model schedule resulted in a further definition of the mission payloads, the Space Station architecture and the STS requirements was developed in task 2. The information was used to estimate the cost parameters necessary to generate cost estimates for the system with the aid of cost models for the Missions, Space Station and Space Transportation.
Space station needs, attributes and architectural options study costing working group briefing
1983-04-07
Report
Keine Angabe
Englisch