Payload/mission development, processing flows, facilities/systems, and the various environments to which a payload is exposed during ground processing are described. These considerations are important for payload design and ground processing requirements development.
KSC Shuttle ground turnaround evaluation
01.02.1983
Aufsatz (Konferenz)
Keine Angabe
Englisch
Shuttle ground turnaround operations
NTRS | 1974
|Shuttle ground turnaround and launch projections
NTRS | 1982
|Shuttle ground turnaround and launch projections
AIAA | 1982
|Spacehab flexibility wins shuttle-Mir contract - Ground turnaround time a deciding factor
Online Contents | 1995