A procedure to be followed for a model to be accepted for testing in the NTF is outlined. Planning meeting; pre-test conference; model receipts, assembly, and checkout; and model installation and test are discussed.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    NTF user operations requirements


    Beteiligte:
    Fuller, D. E. (Autor:in)


    Erscheinungsdatum :

    01.03.1983


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Development of transportation operations requirements. Operations planning

    S. T. Grady / R. E. Best / F. L. Danese et al. | NTIS | 1990


    External Occulter Operations Requirements

    Kochte, M. / Schultz, A. B. / Jordan, I. J. E. et al. | AIAA | 2004


    Aircraft Operations Based Mission Requirements

    McDonald, R. / American Institute of Aeronautics and Astronautics | British Library Conference Proceedings | 2012


    Airport Surface Operations Requirements Analysis

    J. L. Groce / G. J. Vonbokern / R. L. Wray | NTIS | 1993