The low Earth orbit (LEO) versus the geosynchronous Earth orbit (GEO) deployment systems were discussed. The following items are emphasized: (1) large area systems, such as deployment, altitude, orbit transfer, and on orbit operation; (2) propulsion oriented issues such as the orbit transfer vehicle and the auxiliary propulsion systems; (3) programmatic issues. The LEO versus GEO deployment is a significant driver on propulsion requirements for an orbit transfer vehicle. It is suggested that early systems will be deployed at LEO. The Shuttle remote manipulator system (RMS) will not be involved in early demonstration activities. It is concluded that an integrated large space system/propulsion approach is essential and that propulsion development requirements need to be established.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    System Requirements and Operations Panel Workshop summary


    Beteiligte:


    Erscheinungsdatum :

    01.06.1982


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Missions panel workshop summary

    Chase, R. L. | NTRS | 1982



    Summary of the panel discussion on motion cueing requirements

    Schroeder, Jeff / Hosman, Ruud / Lehman, Chris et al. | AIAA | 2001



    Workshop Summary

    IEEE | 2007

    Freier Zugriff