A concept for building the 5000 MW reference solar power satellite in Earth orbit is discussed. The system uses silicon solar cells. The GEO base has contiguous facilities for concurrent assembly and subsequent mating of the satellite energy conversion system and its power transmission antenna. The end builder construction system uses 10 synchronized beam machines to automatically fabricate continuous longitudinal beams for the energy conversion system.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Specific SPS construction studies: Construction tasks, construction base


    Beteiligte:


    Erscheinungsdatum :

    1980-07-01


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Road construction tasks in West Germany

    Oberbach, J. | Engineering Index Backfile | 1956




    LUNAR BASE CONSTRUCTION

    Johnson, G. W. | NTRS | 1963


    Lunar Base Construction

    Johnson, G. W. | NTRS | 1963