The technical feasibility of the Satellite Power System (SPS) is discussed. The development of feasible operational concepts and conceptualization of specific construction tasks are examined. The logic flow of functional analyses of both the rectenna and the satellite is illustrated. Constraints placed upon the construction processes and equipment by the satellite design are outlined. The construction tasks, when defined and combined into an integrated schedule establish, a time line for construction mass flow demands to be satisfied by the space transportation systems. An example of satellite constructive demands and HLLV delivery capabilities is given.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Specific construction tests


    Beteiligte:


    Erscheinungsdatum :

    1980-07-01


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Pendulum Tests on Specific Hydrofoil Designs

    T. Andrews / R. SMITH | NTIS | 1959



    Overhead construction -- Tools, specifications and tests

    Harte, Charles R. | Engineering Index Backfile | 1916


    Product quality by specific reliability tests during development

    Thoms,U. / Kuehlmeyer,M. / Volkswagen,Wolfsburg,DE | Kraftfahrwesen | 1992


    Tests on duralumin columns for aircraft construction

    Lee, J.G. | Engineering Index Backfile | 1924