Candidate vertical control systems (VCS) and face advancement systems (FAS) required to satisfactorily automate the longwall system were analyzed and simulated in order to develop an overall longwall system configuration for preliminary design.
Automated longwall guidance and control systems, phase 1
1978-09-06
Report
Keine Angabe
Englisch
An approach to automated longwall mining
AIAA | 1979
|Longwall Shearer Tracking System
NTIS | 1982
|