The activities and results of the test and operations program performed on the three orbiter spacecraft (VO-1, VO-2, and VO-3) are described. The period from receipt of orbiter hardware at the Spacecraft Assembly Facility at JPL through shipment of the orbiter systems and support equipment to the Air Force Eastern Test Range is covered.
Viking 75 Orbiter system test and launch operations. Volume 1: System test
1977-01-31
Report
Keine Angabe
Englisch