In order to reduce the air traffic delay in the terminal area, an immediate remedy is to increase airport capacity by an expansion of the existing runway system. The runway expansion program is often limited by budgetary constraints; the expensive facilities for a long-term improvement cannot be built at once. When a runway improvement strategy is being considered for a longer planning horizon, the investiment decision depends upon the interrelations of its composite periods. The problem, therefore, is to determine how time factor and investment decisions interact to yield an optimal improvement scheme that meets demand at a minimum cost. With this objective in mind, a dynamic programming methodology is employed to determine the optimal planning scheme. Also, an example runway improvement problem is tested to illustrate how a dynamic programming model is practical in actual application.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Optimizing airport runway improvement program - A dynamic programming approach


    Beteiligte:
    Yu, J. C. (Autor:in) / Gibson, D. R. (Autor:in)

    Kongress:

    Modeling and simulation. Volume 6


    Erscheinungsdatum :

    01.01.1975


    Medientyp :

    Sonstige


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Airport runway approach lighting apparatus

    KIM TAE JIN | Europäisches Patentamt | 2019

    Freier Zugriff


    Newark Airport Runway

    King, Gayle / Rowe, Geoffrey / Reinke, Gerry | Transportation Research Record | 2013


    Airport Runway Brooms

    SAE Technical Papers | 2016