The transportation cost associated with space materials processing were studied to determine the feasibility of space manufacturing. The assumptions use to determining the cost estimates for a 12 year planning period are listed, and the orbitor is described in terms of payloads. Shuttle operational costs, ground operational costs, and nonrecurring investment and development costs were analyzed.
Space shuttle
15.06.1975
Sonstige
Keine Angabe
Englisch
GWLB - Gottfried Wilhelm Leibniz Bibliothek | 2001
NTRS | 1971
|NTIS | 2005
|NTIS | 2003
|NTRS | 1978