Descriptions are given of candidate components for the Phase B Study of the Spacelab environmental control system. Most of the hardware was defined for the baseline ECS design concept. A low cost design approach was followed, with most of the components being selected from the Apollo and Skylab Programs.
Spacelab Phase B study environmental control system component handbook
01.03.1974
Report
Keine Angabe
Englisch