The costs of tug refurbishment were studied, using existing cost estimating relationships, to establish the cost of maintaining the reusable third stage of the space transportation system. Refurbishment operations sheets which describe the actual tasks that are necessary to keep the equipment functioning properly were used along with refurbishment operations sheets which contain all of the pertinent descriptive information for each of the major vehicle areas. Tug refurbishment costs per mission are tabulated.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Analysis of space tug operating techniques (study 2.4). Volume 1: Executive summary


    Erscheinungsdatum :

    01.08.1972


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :