The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Spacecraft platform cost estimating relationships


    Beteiligte:
    Gruhl, W. M. (Autor:in)

    Erscheinungsdatum :

    01.03.1972


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch


    Schlagwörter :


    Functional Cost-Estimating Relationships for Spacecraft

    N. I. Om / J. K. Roth / M. L. Corso et al. | NTIS | 1996


    Spacecraft Program Cost Estimating Manual

    W. P. Finnegan / C. A. Stone | NTIS | 1966


    Spacecraft Program Cost Estimating Manual

    Finnegan, W. P. / Stone, C. A. | NTRS | 1966