Dellingr is a 6U Cubesat developed by NASA Goddard Space Flight Center. It was delivered to the International Space Station in August 2017, and is scheduled to be deployed in November 2017. Compared to a typical NASA satellite, the Dellingr Cubesat had an extremely low budget and short schedule. Although the Dellingr Cubesat has minimal hardware resources, the cFS was ultimately chosen for the flight software. Using the cFS on the Dellingr Cubesat presented a few challenges, but also offered opportunities to help speed up development and verify the ACS flight software. This presentation will cover the lessons learned in porting the cFS to the Dellingr Cubesat, including working with the limited hardware resources, porting the cFS to FreeRTOS, and overcoming limitations related to data storage and file transfer. This presentation will also cover how hardware abstraction was used to run the flight software on multiple platforms and interface with the 42 dynamic simulator.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Porting the Core Flight System to the Dellingr Cubesat


    Beteiligte:
    A. Cudmore (Autor:in)

    Erscheinungsdatum :

    2017


    Format / Umfang :

    17 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Mayflower: Next Generation CubeSat Flight Testbed

    Jaeger, T. / Ciffone, M. / Anden, E. et al. | British Library Conference Proceedings | 2011


    NANOFF: A 2U-CUBESAT FORMATION FLIGHT MISSION

    Weiss, Sascha / Korn, Nikolas / Wolf, Ronny et al. | TIBKAT | 2020


    Underwater Vehicle Porting System

    M. DeMarco | NTIS | 1981


    IMPROVING CUBESAT OPERATIONS USING FLIGHT PERFORMANCE TELEMETRY

    Carvajal-Godinez, Johan / Jiménez, Adolfo Chaves / Rojas, Juan J. | TIBKAT | 2020