The project is intended to increase the traffic carrying capacity of Waldo Boulevard to handle present day and future traffic volumes safely and efficiently on this regional thoroughfare which at the present time is the only continuous major East-West street extending across the entire city of Manitowoc. The project begins at the junction of 42nd Street and Waldo Boulevard (junction U.S. Highway 141, U.S. Highway 10 and STH 42), extends in a easterly direction along Waldo Boulevard (U.S. Highway 10 and STH 42) approximately 2.6 miles to the junction with Memorial Drive. The lands within the project are highly developed and front on an existing major traffic route. Therefore, the project will have only minimal changes on the existing environment. A bridge will be constructed over the Chicago and North Western Transportation Company tracks as part of this project. It will replace an existing bridge and will be designed in line with today's design practices.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Project F019-4 ( ) 1474-0-00, Waldo Boulevard (City of Manitowoc) S.T.H. 42 and U.S.H. 10, Manitowoc County, Wisconsin


    Erscheinungsdatum :

    1973


    Format / Umfang :

    66 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch