The Texas Department of Transportation (TxDOT) was the administering agency for the Texas Traffic Light Synchronization (TLS) Grant Program III which was funded with Oil Overcharge funds made available by the Governor's Energy Office. The TLS Program was approved by the United States Department of Energy as a part of a package of transportation-related programs with the objective of reducing energy consumption. TLS III resulted in a total expenditure of $1.7 million in program funds and local matches for the optimization of traffic signal timing plans and the replacement outdated signal controller equipment across the state. As stated previously, the program's objective was to reduce traffic congestion and facilitate the flow of traffic, with the goal of achieving more efficient use of energy resources. This report is the second of two volumes.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Benefits of the Texas Traffic Light Synchronization (TLS) Grant Program 3. Volume 2. Appendices D-F


    Beteiligte:
    D. B. Fambro (Autor:in) / D. A. Noyce (Autor:in) / C. A. Lopez (Autor:in) / X. Q. Zhang (Autor:in) / R. T. Barnes (Autor:in)

    Erscheinungsdatum :

    1995


    Format / Umfang :

    124 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch