This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed. Keywords: Coast Guard aircraft; Cost models; Cost estimates; Theses; Operations & maintenance costs; U.S. Coast Guard; Aircraft; Cutters; Regression analysis; Life cycle costs; Budget models; Coast Guard ships. (kt)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Operations and Maintenance Costs for New Major U.S. Coast Guard Platforms: Projected Versus Actual Costs


    Beteiligte:
    J. E. Frost (Autor:in)

    Erscheinungsdatum :

    1989


    Format / Umfang :

    186 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    An evaluation of contractor projected and actual costs

    Kwiatkowski, Kent A. / Buffalano, Charles | TIBKAT | 1974


    Engine-Maintenance Costs Versus Fuel-Burn Costs

    Masoudi, S. | British Library Conference Proceedings | 2006



    Cost of U.S. Coast Guard Regulations to the U.S. Maritime Industry and Coast Guard Initiatives to Reduce These Costs

    Henn, A. E. / Marhoffer, W. R. | British Library Conference Proceedings | 1993


    U.S. Coast Guard Buoy Tenders: Historical and Projected Usage

    R. T. Walker / C. W. Pritchett / W. B. Lincoln | NTIS | 1987