This report defines the minimum required conditions necessary to qualify payload software prior to launch or use on orbit. The recommended approach is to complete full payload system (software, hardware, integration, and external interface) qualification prior to launch. If launch will take place before full payload qualification, then Core payload software functionality (i.e., bootstrap startup, spacecraft communications, system upload, hardware/software status reporting, and safing) must be fully qualified before launch. - Incremental upload of the software must be planned, architected, designed, and exhaustively tested. - Core software must be integrated and tested with all unqualified software using a qualified test environment prior to upload. In either case, full qualification of both core and basic (i.e., non-core) payload software must be complete before on-orbit use.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Recommended Process for Qualification Testing of Payload Software Prior to Use on Orbit


    Beteiligte:
    S. J. Alvarado (Autor:in) / J. C. Cantrell (Autor:in) / R. L. Klungle (Autor:in)

    Erscheinungsdatum :

    2006


    Format / Umfang :

    17 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Mechanical qualification testing of SMOS payload module

    Bajo, Jose M. / Gil, Miguel A. / Plaza, Miguel A. | AIAA | 2006



    AGILE payload - development and testing of the simplified qualification model

    Acquaroli, L. / Morelli, B. / European Space Agency | British Library Conference Proceedings | 2005