The implementation of traffic operations improvements on New Jersey Route 3 is covered in this report. Four traffic demonstrations were conducted: dedicating a mainline lane to entering traffic, closing to entering traffic ramps, and restriping a major merge. This volume is the second in a five-volume set covering the traffic demonstration studies and surveillance and control design for the New Jersey Route 3 Urban Corridor Demonstration Program.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Urban Corridor Demonstration Program Manhattan CBD-North Jersey Corridor, New Jersey Route 3 Traffic Demonstrations. Volume II


    Erscheinungsdatum :

    1975


    Format / Umfang :

    54 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch