The LISA science requirements and conceptual design have been fairly stable for over a decade. In the interest of reducing costs, the LISA Project at NASA has looked for simplifications of the architecture, at downsizing of subsystems, and at descopes of the entire mission. This is a natural activity of the formulation phase, and one that is particularly timely in the current NASA budgetary context. There is, and will continue to be, enormous pressure for cost reduction from both ESA and NASA, reviewers and the broader research community. Here, the rationale for the baseline architecture is reviewed, and recent efforts to find simplifications and other reductions that might lead to savings are reported. A few possible simplifications have been found in the LISA baseline architecture. In the interest of exploring cost sensitivity, one moderate and one aggressive descope have been evaluated; the cost savings are modest and the loss of science is not.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Rightsizing LISA


    Beteiligte:
    R. T. Stebbins (Autor:in)

    Erscheinungsdatum :

    2009


    Format / Umfang :

    10 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Rightsizing LISA

    Stebbins, Robin T. | NTRS | 2008


    Rightsizing LISA

    Stebbins, Robin T. | NTRS | 2009


    Rightsizing durch Outsourcing

    Zietlow, Marku | IuD Bahn | 1995


    "Rightsizing" - all right

    Curt Rint | IuD Bahn | 1994


    Rightsizing mit Client/Server

    Bauer, Michael | IuD Bahn | 1994