Thirty two tests have been performed to determine forces associated with rubble ice moving against a model cable-moored platform, using the IIHR ice towing tank facility. The rubble ice was formed by freezing sheets of urea-doped ice to the appropriate thickness (5 or 25mm) and then breaking up these sheets using a pushblade on the motorized carriage. The broken ice was stored under insulation while further sheets were grown. For the tests, the rubble ice was spread into layers 5, 50 or 100mm thick.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Ice Rubble Impact with a Moored Platform


    Beteiligte:
    W. A. Nixon (Autor:in) / R. Ettema (Autor:in)

    Erscheinungsdatum :

    1988


    Format / Umfang :

    57 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Setdown of a catenary-moored gravity platform

    Padmanabhan, B. | Tema Archiv | 1996


    RESULTS OF A MOORED PROFILING PLATFORM TEST

    Waldmann, C. / Bergenthal, M. | British Library Online Contents | 2003


    Elomar - A moored platform for wind turbines

    Bertacchi, P. / Di Monaco, A. / Gerloni, M. de et al. | Tema Archiv | 1994


    Setdown of a Catenary-moored Gravity Platform

    Padmanabhan, B. / Ertekin, R. C. | British Library Online Contents | 1996


    RUBBLE LOADING DEVICE

    SAKAMOTO TAKUMI | Europäisches Patentamt | 2024

    Freier Zugriff