Results of 16 borings performed at certain locations along Glenmont Route on the Metropolitan Branch of B and O Railroad are summarized herein. The purpose of the work was to provide information on subsoil conditions at the location of 11 retaining walls to be constructed for the subway line. The report contains geological sections at the structures, logs of the borings, results of laboratory tests on split-spoon and undisturbed soil samples and conclusions regarding subsoil properties. (Author)
Section B006: Glenmont Route, Subsurface Investigation Retaining Wall Locations between Stations 226 plus 48
1972
37 pages
Report
Keine Angabe
Englisch