The Minnesota Department of Transportation, in cooperation with Hennepin County and the cities of Bloomington, Edina and Richfield, is conducting an operational test of an integrated corridor traffic management system (ICTM). The test involves an eight-mile-long segment of I-494 in the Twin Cities metropolitan area and the adjacent arterial street system, shown in Exhibit A. In general, the test involves the phased implementation of an adaptive traffic control system with both freeway ramp meter and arterial traffic signals with the ability to continuously adjust timing plans in response to real-time flow conditions. This interim report documents the evaluation analysis of the initial ICTM project implementation phase involving Modules 1 and 2 which includes adaptive controls at 27 ramp meters and integration with the existing freeway management system (FMS) as Module 1.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Partners in Motion: 494 Transportation Corridor ICTM Project


    Erscheinungsdatum :

    1996


    Format / Umfang :

    187 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    An ITS Maintenance Plan for the 494 Integrated Corridor Traffic Management (ICTM) Project

    Taavola, D. J. / Greene, S. / Erickson, G. et al. | British Library Conference Proceedings | 1996





    Intelligent corridor transportation elevator

    CHEN CHANGZHU / LI KAI / FENG CHANGHUI | Europäisches Patentamt | 2016

    Freier Zugriff