Part 5 of the AH-1G helicopter Phase B test was conducted at Yuma Proving Ground, Yuma, Arizona, from 6 through 9 February 1968 by the US Army Aviation Test Activity, Edwards Air Force Base, California. The test consisted of firing the XM-28 chin turret, with one 7.62 millimeter automatic gun (M-134) and one 40 millimeter grenade launcher (XM-129) to determine the weapons system's effect on the stability and control characteristics of the helicopter. No safety of flight restrictions resulted from firing this system within the flight envelope. Correction of four deficiencies is mandatory to provide acceptable mission effectiveness and safety. These deficiencies are the inadequate forward visibility from the pilot's cockpit due to the N-9A gunsight installation, the lack of a fire warning system, the lack of a standby generator for IFR flight, and link jam malfunctions of the minigun during symmetrical pull-out maneuvers. Fifteen shortcomings, for which correction is desirable, limit mission effectiveness. The reliability of the weapons system was questionable and service type testing should be conducted prior to system acceptance. Correction of the deficiencies is mandatory and should be tested prior to deployment. Shortcomings, for which correction is desirable, should be corrected on a high priority basis. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Engineering Flight Test of the AH-1G Helicopter Equipped with the XM-28 Chin Turret with One 7.62MM Automatic Gun (M-134) and One 40MM Grenade Launcher (Xm-129)-Hybrid. Phase B, Part 5


    Beteiligte:
    P. V. Passinisi (Autor:in) / W. J. Connor (Autor:in)

    Erscheinungsdatum :

    1968


    Format / Umfang :

    51 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch