This report provides the macrobehavior of development costs and estimates for these five systems: (1) PERSHING missile system; (2) SERGEANT missile system; (3) M561 (GAMA GOAT) truck; (4) SHERIDAN vehicle; and (5) Advanced Aerial Fire Support System (AAFSS)(AH-56A). The STEC plot is developed to present the normalized development data. A new RDTE quantitative macrobehavior measure, the EFFICACY RATING, is developed to describe, not judge, the development phase of a weapon system. (Author)
Macrobehavior of Development Costs and Estimates (Stec Plots)
1968
34 pages
Report
Keine Angabe
Englisch
Domestic Commerce, Marketing, & Economics , Management Practice , Tanks(Combat vehicles) , Helicopters , Guided missiles(Surface-to-surface) , Vehicles , Costs , Operations research , Systems engineering , Weapon systems , Integrated systems , Management planning , Budgets , Research program administration , Cost effectiveness , Advanced planning , Contracts , Industrial production , Statistical analysis , Performance(Human) , M-561 trucks(1-1/4-ton) , Sergeant , Pershing , AH-56A aircraft , Sheridan tanks , STEC(Study of Trends and Escalation of Costs) , STEC plots , H-56 aircraft , AAFSS(Advanced Aerial Fire Support System) , Advanced aerial fire support systems , Cost analysis , Graphs(Charts) , XMTM-31B missiles , XMGM-29 missiles
Prototype STEC Plant, Task 5 Report
NTIS | 1972
|Tucumán ionospheric model (TIM): Initial results for STEC predictions
Online Contents | 2016
|Lufthansa chief plots turnaround strategy - To reduce operating costs
Online Contents | 1993
Program Plan, Proof-of-Concept STEC Plant, Task 3 Report
NTIS | 1972
|