In early April 1985, SOUTHNAVFACENGCOM will undertake the installation of three fleet moorings about eight miles west of the Naval Station (NAVSTA) Mayport, Florida in the St. Johns River. These will be free-swinging hurricane type moorings to be used to moor YD, YC, barges, and other harbor craft. This execution plan has been developed to establish the responsibilities of participating organizations and to provide guidelines/procedures to be followed during the accomplishment of this project. This plan includes mooring description and a bill of materials; installation procedures; the personnel skills, material, and equipment required to successfully complete the installation; and the post installation testing and inspection requirements. Keywords: Fleet moorings.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Naval Station Mayport Project Execution Plan


    Erscheinungsdatum :

    1985


    Format / Umfang :

    59 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch