The Route 3 Traffic and Development Study was conducted in cooperation with the Town of Rocky Hill, the Capitol Region Council of Governments (CRCOG), and the Connecticut Department of Transportation (ConnDOT). The purpose was to develop a comprehensive transportation plan for the study area to guide the Town and State on future transportation system improvements. The main study roadways include Cromwell Avenue (Route 3), West Street (SR 411), Brook Street, New Britain Avenue (Route 160), Elm Street (Route 160), and Main Street (Route 99). Local roads that play an important role in traffic circulation within this network were reviewed as well.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Route 3 Traffic and Development Study. Final Study Report Executive Summary


    Erscheinungsdatum :

    2012


    Format / Umfang :

    10 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    ET-CFK Final Report - Executive Summary

    Behruzi, Philipp / Hunt, Andrew / ArianeGroup GmbH | TIBKAT | 2020


    Users feasibility study : common final report Germany/Japan ; executive summary

    Daimler-Benz Aerospace AG, Produktbereich Raumfahrt-Infrastruktur | TIBKAT | 1995


    ET-CFK Final Report - Executive Summary

    Behruzi, Philipp / Hunt, Andrew / ArianeGroup GmbH | TIBKAT | 2020

    Freier Zugriff