This Acceptance/Operational Test Report will document the satisfactory operation of the 103-SY/101-SY Purge Control System and the 103-SY Video Camera System after installation into riser 5B of tank 241-SY-103.
Acceptance/operational test report 103-SY and 101-SY tank camera purge system and 103-SY video camera system
1994
14 pages
Report
Keine Angabe
Englisch