The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Integrated Guidance, Navigation and Control Verification Plan Primary Flight System


    Erscheinungsdatum :

    1978


    Format / Umfang :

    176 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch






    Integrated Flight Path Planning System and Flight Control System for Navigation and Guidance of Unmanned Helicopter

    Lin, Y.-H. / Institute of Navigation | British Library Conference Proceedings | 2009


    FLIGHT PLAN CREATION METHOD AND FLIGHT BODY GUIDANCE SYSTEM

    OTANI HITOSHI / SASAKI DAISUKE / FUKAYA NOBUYUKI et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    Integrated navigation, flight guidance, and synthetic vision system for low-level flight [4023-11]

    Mehler, F. E. / International Society for Optical Engineering | British Library Conference Proceedings | 2000