Comparisons were made to determine the feasibility of incorporating a standardized procedure to provide reasonably accurate estimates of removals or failures and provisioning factors for avionics equipment. Three prediction methods were used to estimate the number of removals or failures to be experienced by five avionic systems on the S-3A aircraft during a period of 13 calendar months (9002 flight hours). Predicted values of removals or failures were compared with observed values reported in the Naval Maintenance and Material Management Reporting System.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Feasibility of Predicting Operational Removals or Failures of New Avionic Equipment (MTBR Tracking of S-3A Avionics)


    Beteiligte:
    R. R. Boyce (Autor:in) / R. C. Trakas (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    79 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Culprits causing avionic equipment failures

    Wong, K.L. / Quart, I. / Kallis, J.M. et al. | Tema Archiv | 1987


    Enhancing operational readiness of avionic systems

    DeArmond, F.B. | Engineering Index Backfile | 1966


    AVIONIC EQUIPMENT HEATING

    PINEAU JEAN-PHILIPPE / SARNO CLAUDE / HODOT ROMAIN et al. | Europäisches Patentamt | 2017

    Freier Zugriff

    Avionic equipment heating

    PINEAU JEAN-PHILIPPE / SARNO CLAUDE / HODOT ROMAIN et al. | Europäisches Patentamt | 2019

    Freier Zugriff