The objective of this study is to investigate the performance of the ODOT Deep Beam bridge guardrail system per the NCHRP Report 350 TL-3 criteria and identify needed design changes. The final expected product is a design of the ODOT Deep Beam Bridge railing system with any needed retrofit that will bring the system into compliance with the NCHRP Report 350 performance criteria per TL-3. This design should utilize existing rail components with simple retrofit and minimal construction effort.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Development of a TL-3 Deep Beam Tubular Backup Bridge Rail, Executive Summary Report


    Beteiligte:
    A. Y. Abu-Odeh (Autor:in) / W. F. Williams (Autor:in) / C. E. Buth (Autor:in) / K. M. Kim (Autor:in)

    Erscheinungsdatum :

    2010


    Format / Umfang :

    4 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Development of a TL-3 Deep Beam Tubular Backup Bridge Rail

    A. Y. Abu-Odeh / W. F. Williams / C. E. Buth et al. | NTIS | 2010


    Tubular W-Beam Bridge Rail

    T. J. Hirsch / J. J. Panak / C. E. Buth | NTIS | 1978


    Bridge Formula Development. Executive Summary

    J. S. Noel / R. W. James / H. L. Furr et al. | NTIS | 1985



    Executive summary report

    Thomson Tubes Electroniques GmbH / European Space Agency | SLUB | 1990