Incinerator residue has not been used as a road material in Sweden in contrary to many other countries. Material from the SYSAV plant in Malmo has, however, been laid in the autumn 1982 as a subbase aggregate in flexible pavement test sections in the Malmo harbor and the incinerator plant area of SYSAV - both carrying heavy commercial traffic. Road failures in the form of alligator cracking have occurred and VTI has afterwards been called in to make an investigation.
Undersoekning av Foerbraenningsrest fran SYSAV, Malmoe, Genom Laboratorie- och Provvaegsfoersoek (Laboratory Study and Test Road Experiments of Incinerator Residue at SYSAV, Malmoe)
1985
58 pages
Report
Keine Angabe
Englisch
British Library Online Contents | 1998
Demonstrationsbusslinjen i Malmoe
British Library Conference Proceedings | 1991
|British Library Conference Proceedings | 1990
|CVM-studie av minskad trafik paa Trelleborgsvaegen i Malmoe
British Library Conference Proceedings | 1999
|Die Eisenbahnfernsprechkabel laengs den elektrifizierten Strecken Stockholm -- Malmoe
Engineering Index Backfile | 1932
|