Design of the buoy-dolphin mooring system for the Diego Garcia pier was driven by operational requirements, installation constraints and environmental considerations which make the mooring quite different from standard Navy Fleet Moorings. These differences make the installation of the moorings more critical in some respects than conventional fleet moorings; and they need to be understood by those responsible for the hardware acquisition and installation. Keywords: Mooring systems, Buoys.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Pier Buoy Mooring Project and Maintenance to Existing Mooring Diego Garcia B.I.O.T. Installation Plan


    Beteiligte:
    K. Cooper (Autor:in)

    Erscheinungsdatum :

    1980


    Format / Umfang :

    150 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    MOORING BUOY

    PLATÈ BONFIGLIO / ROVERE LUCA FRANCESCO MARIA / SALTARELLI PAOLO | Europäisches Patentamt | 2020

    Freier Zugriff

    MOORING SYSTEM AND MOORING BUOY

    ADAMS ROBERT WILLIAM | Europäisches Patentamt | 2017

    Freier Zugriff

    MOORING SYSTEM AND MOORING BUOY

    ADAMS ROBERT WILLIAM | Europäisches Patentamt | 2016

    Freier Zugriff

    MOORING BUOY

    ANDERSEN WILHELM KJETIL / SAMONA FERDINANDO | Europäisches Patentamt | 2025

    Freier Zugriff

    MOORING BUOY

    PLATÈ BONFIGLIO / ROVERE LUCA FRANCESCO MARIA / SALTARELLI PAOLO | Europäisches Patentamt | 2019

    Freier Zugriff