The report presents an assessment of available information pertaining to implementing mass production of gas turbine powered automobiles. The status of the technology and implementation schedule visibility reported herein is that existing at the time of data acquisition visits made to selected firms and agencies during the period February 28 through April 30, 1973. The results of this study are presented in two volumes. Volume I, the Executive Summary, presents a review of important findings and conclusions in the highlights and summary sections.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Gas Turbine Engine Production Implementation Study. Volume I: Executive Summay


    Beteiligte:
    D. E. Lapedes (Autor:in) / L. Forrest (Autor:in) / F. G. Ghahremani (Autor:in) / M. Hinton (Autor:in) / T. Iura (Autor:in)

    Erscheinungsdatum :

    1973


    Format / Umfang :

    11 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Gas turbine engine production implementation study. Volume 1: executive summary

    Lapedes, D. / Forrest, L. / Ghahremani, F. | Tema Archiv | 1973


    Gas Turbine Engine Production Implementation Study. Volume II: Technical Discussion

    D. E. Lapedes / L. Forrest / F. G. Ghahremani et al. | NTIS | 1973



    Small turbine engine noise reduction. Volume 1: Executive summary

    Heldenbrand, R. / Tedrick, R. | Tema Archiv | 1973


    Gas turbine production implementation study. Volume II: Technical discussion

    Lapedes, D. / Forrest, L. / Ghahremani, F. | Tema Archiv | 1973