A two-dimensional numerical model, TABS-2, was used to predict fine sediment deposition in the lock approach channels upstream and downstream from Lock and Dam No. 3 on the Red River Waterway, Louisiana. The numerical model was used to evaluate the effects of various design changes on fine sediment deposition. These included the cross-section shape in the upstream lock approach channel, the distance between the lock wall and the first spillway gate, the number of openings in the ported guard wall, and location of a berm in the upstream channel.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Red River Waterway, Lock and Dam Number 3. Report 5. Sedimentation in Lock Approaches. TABS-2 Numerical Model Investigation


    Beteiligte:
    R. R. Copeland (Autor:in) / B. M. Comes (Autor:in) / W. A. Thomas (Autor:in)

    Erscheinungsdatum :

    1991


    Format / Umfang :

    182 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch





    Red River Waterway, Lock and Dam No. 4. Report 5: Sedimentation in Lock Approaches: TABS-2 Numerical Model Investigation

    Copeland, Ronald R. / Heath, Ronald E. / Thomas, William A. et al. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1990

    Freier Zugriff

    Red River Waterway, Lock and Dam No. 3. Report 5: Sedimentation in Lock Approaches: TABS-2 Numerical Model Investigation

    Copeland, Ronald R. / Comes, Bradley / Thomas, William A. et al. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1991

    Freier Zugriff


    Red River Waterway, Lock and Dam No. 3. Report 3: Sedimentation Conditions Hydraulic Model Investigation

    McCollum, Randy A. / United States. Army. Corps of Engineers. Vicksburg District. / United States. Army. Corps of Engineers. New Orleans District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1997

    Freier Zugriff