The activities of the ATS-6 spacecraft for the checkout period of approximately four weeks beginning May 30, 1974 are described, along with the results of a performance evaluation of its subsystems and components. The following specific items are discussed: (1) subsystem requirements/specifications and in-orbit performance summary; (2) flight chronology; (3) spacecraft description; (4) structural/deployment subsystems; (5) electrical power subsystem; (6) thermal control subsystem; (7) telemetry and command subsystems; (8) attitude control subsystem; (9) spacecraft propulsion subsystem; (10) communication subsystem; and (12) experiment subsystem.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Applications Technology Satellite Ats-6 in Orbit Checkout Report


    Beteiligte:
    W. Moore (Autor:in) / W. Prensky (Autor:in)

    Erscheinungsdatum :

    1974


    Format / Umfang :

    389 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch